Pre-drilling for solar mounting structures

Not every soil allows piles to be driven directly. In rocky and stony ground we pre-drill first and then drive the piles. With 10 drilling rigs of our own we work in every type of ground.

10

drilling rigs of our own

every

type of ground, rock included

6 m

piles driven into the holes

Scope of work

Pre-drilling for PV mounting structures in rocky ground: 10 drilling rigs of our own and 6 m pile driving in every type of soil.

  • Review of design documents and ground conditions
  • Drilling holes for PV structure piles
  • Pre-drilling in rocky ground before piling
  • Driving piles into prepared holes
  • Survey control and reporting

TSA Power Group

Why TSA Power Group

Drilling and piling are done by one company, so there is no downtime between crews. Our experience on the rocky ground of Sicily, at the foot of Mount Etna, lets us plan the rate even on the toughest sites.

Pre-drilling for solar mounting structures

FAQ

Frequently asked questions

When is pre-drilling needed?

When the ground contains rock, large stones or hard layers that prevent correct pile driving or could damage the pile.

Do you drill in every type of ground?

Yes. With 10 drilling rigs of our own we drill holes for PV structures in every type of ground.

Does the same crew do pre-drilling and piling?

Yes, both stages are delivered with our own equipment and crews.

Contact

Let us quote your project

Send us the location, plant capacity and structure type – we will reply with a quote or follow-up questions.

Artur KulińskiInternational Development Director+48 698 833 888biuro@tsapower.pl
Tomasz OrdonOperations Director – Europe+48 506 020 560biuro@tsapower.pl
CallWhatsAppFree quote