Pile driving for PV mounting structures
Our own fleet of GAYK HRE3000 and HRE5000 pile drivers and Bipromasz KB-4G machines, upgraded to our specifications. We drive piles for up to 12 MW per day, on any terrain, with survey control of every row. All our pile drivers are equipped to drive 6 m piles, which also allows us to deliver projects with high-clearance structures and trackers. In addition, we operate a fleet of 10 in-house drilling rigs for drilling holes for PV mounting structures in all ground conditions – including rocky ground, where pre-drilling is required before pile driving.