Pile driving for solar mounting structures
Pile driving is the first and most important stage of building a solar farm: pile accuracy determines structure alignment, installation speed and the lifetime of the plant. We drive piles with our own fleet, operators and surveyors.
per day – maximum piling rate
pile length for every rig we own
of piled structures in total
Scope of work
Pile driving for PV mounting structures: GAYK HRE3000, HRE5000 and Bipromasz KB-4G pile drivers, piles up to 6 m, up to 12 MW per day, survey control of every row.
- Survey setting-out of pile positions and control of every row
- Pile distribution across the site
- Pile driving with GAYK HRE3000, HRE5000 and Bipromasz KB-4G rigs
- Piles up to 6 m – including tall structures and trackers
- Pre-drilling in rocky ground before piling
- Fence post driving
- Progress reports and handovers for the client and EPC contractor
TSA Power Group
Why TSA Power Group
We do not hire in equipment: rigs, drills and people are our own, so we can mobilise several machines to one site quickly and hold the schedule. We know flat sandy coastal sites in Sardinia as well as rocky slopes in Sicily and the hills of Lazio.
FAQ
Frequently asked questions
How many MW per day can you pile?
With full mobilisation of machines and crews we drive piles for up to 12 MW per day, with survey control of every row. The actual rate depends on ground conditions, structure type and material availability.
What piles can you drive?
All our pile drivers handle 6 m piles, so we also deliver projects with tall structures and trackers.
What if the ground is rocky?
We operate 10 drilling rigs of our own. In rocky ground we pre-drill and then drive the piles into the holes.